| Refurbish and remodel entire 4th floor,
incorporating an 18 bed locked (I-3) unit and ADA
upgrades. |
| Refurbish patient floor, which includes all finishes,
accessibility upgrades and remodeling of nurses’
stations. Creation of a new maximum-security, locked (I-3)
unit. |
| Incorporate ADA upgrades and creation of a new I-3 in an existing hospital and existing infrastructure. |
| Developed a new master plan study for the entire hospital,
which allowed us to create a maximum-security unit on
this floor. By paying attention to critical lighting,
we were able to incorporate some existing finishes hence
saving capital and creating a better work environment
resulting in improved patient care. Subsequent to this
project, the facility has been upgrading other patient
floors, modeled after the 4th floor. |